Reconstruction of the
Waldegg Provincial Vocational School

Client: Grund-, Pfahl- und Sonderbau GmbH / SWIETELSKY Construction GmbH
Development Period: 10/2011 to 4/2015

the Project


The buildings of the Waldegg Provincial Vocational School (Lower Austria) have been under a thorough reconstruction.
Parts of the new building complexes had to be cut into the slope, which required slope protection measures during construction.
These measures were carried out in form of bored pile walls with anchoring at one or two levels. The pile diameter was 90 cm and the pile lengths up to 18 m.

our function


BGG Consult was commissioned by the contractor with consulting regarding the optimization of the foundation system on the one hand, and with the detailed design of the slope protection measures on the other hand.
The latter included earth statical analyses as well as the dimensioning and the design of the bored pile walls.

Optimization Foundation and Building Pit Protection for Construction
Phases 1 and 2:

In close cooperation with the technicians of the contractor, a concept with non-reinforced bored piles was developed for the foundation of the structure, which replaced the originally planned underpinning by means of jet grouting.
For the protection towards the existing building, jet grouting was also omitted and a tangent pile wall established. Thus, all special heavy construction could be carried out with one system.
By this value engineering, a technical optimization was done with namable cost benefits for the client as well as for the contractor.